Finishing Tower | Motherwell
Main Contractor | Brick & Steel
Architect | CRGP
27th March 2018
Gray & Dick were employed to supply and fit about 20 tonnes of steel and then clad the exterior in new glazing.
The logistics of this project proved very challenging with the tower being situated on an island with only pedestrian access. This was resolved with a floating pontoon bridge for access and a floating barge for a cherry picker.
The finished project gives uninterrupted views down the full length of the loch.